
12
CHECKING DC AMPERAGE
OUTPUT
16 & 20 AMP REGULATED
ALTERNATOR
To avoid blowing fuse in meter when testing DC
output of 16 and 20 amp system the DC Shunt, Tool
part number ïçìêè, is required.
The DC Shunt must be installed on the ó (negative)
terminal of the battery. All connections must be clean
and tight for correct amperage readings.
1. Install shunt on negative battery terminal.
2. Insert RED test lead into v receptacle in
meter and RED receptacle on shunt.
3. Insert BLACK test lead into
ÝÑÓ
receptacle in
meter and BLACK receptacle on shunt.
4. Rotate selector to
position.
5. With engine running at 3600 RPM, DC output
Table 3.
ÜÝ ß³°»®¿¹» Ñ«¬°«¬ ݸ»½µ
ïê ¿²¼ îð ß³° ͧ-¬»³ Š ÜÝ Í¸«²¬
ÌÛÍÌ ÔÛßÜ
ÜÝ ÍØËÒÌ
ÐßÎÌ ÒËÓÞÛÎ
ïçìêè
ÌÛÍÌ ÔÛßÜ
ÌÛÎÓ×ÒßÔ
ÌÛÎÓ×ÒßÔ
Komentarze do niniejszej Instrukcji